New: CentriCall AI voice agents that answer, qualify, and book around the clock
Cloud Solutions forEnterprise

Enterprise cloud migration that respects the change control you already have

In an enterprise the hard part is rarely the technology. It is identity, connectivity, licensing, and getting a landing zone through governance — so that is where we start.

What changes here

Cloud Solutions in enterprise is not the same engagement

Identity first, because everything else depends on it

Active Directory and Entra integration, conditional access, and privileged access designed before workloads land, so the migration inherits your existing controls instead of forking them.

Hybrid connectivity that is not a bottleneck

Dedicated interconnect or VPN sized against real traffic, with DNS and routing designed for the years you will run both environments side by side.

Legacy workloads assessed honestly

Some systems should be rehosted, some re-architected, and some left exactly where they are. We produce that list with reasoning rather than migrating everything because the programme said so.

The constraints that actually shape the plan

Enterprise migrations fail on governance and dependencies far more often than on engineering. Both are surfaced early, in writing.

  • Change advisory board approval built into each wave rather than discovered at cutover
  • Licence mobility checked before assuming a workload can move — some cannot, economically
  • Undocumented dependencies mapped from traffic, not from memory
  • Data classification driving region and access decisions per workload, not per programme

Assessment, landing zone, and target architecture

An inventory of what you run, a dependency map, and a landing zone with accounts, networking, identity, and guardrails set up before the first workload moves.

Migration and modernization in waves

Applications moved in dependency order — rehost where it earns nothing to change, re-architect to managed services and containers where it pays for itself.

Cloud-native application development

Serverless and container workloads, managed databases, queues, and event-driven services built for the platform rather than ported onto it.

FinOps and cost optimization

Tagging, budgets and alerts, rightsizing, savings plans, and idle-resource cleanup — spend attributed to a team and a service, reviewed monthly.

Resilience, backup, and tested recovery

Multi-AZ design, backup policy, and restores actually rehearsed against an agreed RTO and RPO instead of assumed.

Observability and cloud security posture

Metrics, logs, and traces in one place, with IAM least privilege, encryption, and posture checks running continuously rather than at audit time.

Enterprise questions we get asked

Something more specific? Send us the situation and we’ll answer it straight.

Longer than the vendor slide says, and the variable is dependencies rather than volume. We move in waves so value lands progressively, and we give you a sequenced plan with the risky items named rather than a single date.
Some should not — mainframe-adjacent systems, licence-locked applications, and hardware-dependent workloads. Hybrid is a legitimate end state, and pretending otherwise is how migration programmes overrun.
We build to it. Each wave carries its own change record, rollback plan, and evidence, so approval is a review of a prepared package rather than a negotiation at the window.